Project _

Reference materials

Mountain construction method

External link

Seikan tunnel outline map

 

Seikan tunnel construction site

*The construction has been completed and one track has been removed.

 

*Third phase construction site (center is entrance to inclined shaft)

*The shear truck has two upper and lower wheels.

 

*The white building has a winding machine installed.


  • Reference materials

  • Overview of the Japan-Korea tunnel

  • project

Q&A

Top of page