The September issue of the site newsletter is a survey for the wellhead installation conducted on August 9th and 8th.
The place is Ashibe Slope in Iki.For the survey, we borrowed the position of the wellhead, the direction of the work resistance, and the route.
It is a news from the site that summarizes the situation of the survey.