Project

Reference materials

Mountain construction method

External links

Overview of the Seikan Tunnel

 

Seikan Tunnel construction site

*Construction completed, with one track removed

 

*The third phase construction site (the entrance to the inclined shaft is in the center)

* There are two muck transport vehicles, one on top and one on bottom.

 

* The white building is where the winch is installed.


  • Reference materials

  • Overview of the Japan-Korea Tunnel

  • project

Q&A

Top of Page